local case study

France

Lacs Médocains

The Lacs Médocains photovoltaic park has a power of 41.2 MWp and was commissioned in 2017 in the town of Hourtin in Gironde.

BayWa r.e. built the park and maintains it. Biodiversity is protected and maintenance is carried out by a partner sheep breeder.

Commune d'Hourtin in southwestern France
41.2 MWp of installed capacity
Ground-mounted installation

local case study

France

Lacs Médocains

The Lacs Médocains photovoltaic park has a power of 41.2 MWp and was commissioned in 2017 in the town of Hourtin in Gironde.

BayWa r.e. built the park and maintains it. Biodiversity is protected and maintenance is carried out by a partner sheep breeder.

Commune d'Hourtin in southwestern France
41.2 MWp of installed capacity
Ground-mounted installation